4
IMPORTANT: Before installing your VAPOR-LOGIC
control system, review this checklist to ensure proper
installation of the product. Failure to follow the recom-
mendations listed below could result in failure or
damage to the humidifier or microprocessor.
1. Read this manual and information before
starting.
2. Wiring diagram and information are located
inside the control cabinet door. All information
should remain with the control cabinet after
installation.
3. Locate the control cabinet so that the wire
length from the control cabinet to the
humidifier is 15 metres or less.
4. Connect an approved electric earth ground to
the protective earthing bar in the control
cabinet.
5. Never route the low voltage field control wires
near the line voltage section of the control
cabinet or in the same conduit or cable tray as
line voltage wires.
6. Never use shielded cable for water level probe
wiring.
7. For proper humidifier operation, the heater/
machine ground lug in the junction box must be
attached to the protective earthing bar with the
same size wire as is used in the heater wiring.
8. All humidity and temperature sensor wiring shall
be a 2 or 3-wire, 1.0 mm
2
shield plenum non-
conduit-rated cable with drain wire (see
wiring diagram for appropriate connections).
9. A "shield" grounding connection is provided on
the control cabinet sub-panel to ground the cable
shielding. Do not ground shield at sensor end.
10. Digital Display Module/(key pad) Installation
Precautions
a. Do not locate key pad inside control cabinet.
b. Route modular cable within control cabinet
separated from line voltage circuits.
c. Do not connect or disconnect the modular
cable while power is applied to the
VAPOR-LOGIC board.
11. Verify that VAPOR-LOGIC program code
which is detailed on page 3 of this manual
matches field requirements.
12. Follow the recommended control cabinet field
conduit knockout locations. (See diagram 4-1.)
Knockouts
For Control
Wiring
Diagram identifies recommended knockout locations for
power and control field wiring. (See notes 5 & 6.)
Figure 4-1: Control Cabinet
OM-762
Knockouts
For Heater Wiring
Knockouts For
Power Wiring
VAPOR-LOGIC
®
INSTALLATION CHECKLIST
CAUTION - When providing
holes and knockouts in the
control cabinet, protect all
internal components from debris
and vacuum out cabinet when
finished. Failure to comply with
this warning may damage
sensitive electronic components
and void the DRI-STEEM
warranty.