
D R I - S T E E M V a p o r m i s t h u m i d i f i e r • P a g e 1 3
Va p o r m i s t m o u n t i n g
Figure 13-1:
Vapormist with an SDU-I
Figure 13-2:
Vapormist with an SDU-E
Vapormist and SDU mounting
Mount the Vapormist and SDU to wall studs
using the template on the box. Two lag bolts
are provided with each unit.
SDUs can be mounted directly above the
Vapormist cabinet (as shown at left) or
remotely. Maintain clearances as shown
below. Provide at least 6" (152 mm)
clearance on each side of an SDU when
mounted remotely. For SDU-E clearances
see also Table 22-1: SDU-E minimum non-
wetting distances.
Note that the SDU-E dispersion box requires
an installed condensate drain line. See Page
23 for more information.
OM-282-7
16"
(406 mm)
18.5"
(470 mm)
16"
(406 mm)
3" (76 mm)
18.02"
(458 mm)
16"
(406 mm)
3" (76 mm)
24"
(610 mm)
2" (51 mm)
SDU chassis
Keyhole for 3/8" dia.
(M10) fasteners
Keyhole for 3/8" dia.
(M10) fasteners
OM-282-4
24"
(610 mm)
SDU
chassis
16"
(406 mm)
16"
(406 mm)
Keyhole for 3/8" dia.
(M10) fasteners
3" (76 mm)
3" (76 mm)
Keyhole for 3/8" dia.
(M10) fasteners
Vapormist
chassis
18.50"
(470 mm)
17.75"
(451 mm)
18.02"
(458 mm)
0.25"
(6.4 mm)
Vapormist
chassis
Figure 13-3:
Clearance recommendations
Top (when SDU is not mounted
directly above the Vapormist):
18"(460 mm)
Right side
electrical controls:
36" (915 mm)
Supporting
wall
Front 36"
(915 mm)
Floor: 24" (610 mm)
Left side:
12" (305 mm)
Secured to
supporting
wall
To dispersion
assembly
DC-1201
Comentarios a estos manuales