DriSteem Vapor-logic3 Instrucciones de operaciones Pagina 15

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 75
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 14
13
Figure 13-1: Probe wiring
Brown (full) top probe rod Level A
Orange (refill) middle probe rod Level B
Violet (low water) bottom probe rod Level C
or DI model low-water cutoff switch
Probe wiring to be
18-gauge stranded
wire run in conduit
independent of line
voltage wiring.
Do not use shielded
cable for probe
wiring.
Installation:
Wiring techniques
Proper wiring procedures (cont.).
Installation
Proper wiring prevents electrical noise (cont.)
Do not use chassis or safety grounds as current-
carrying commons. No safety grounds should
ever be used as a conductor or neutral to return
circuit current.
When wiring external electrical connections to
humidistats, room/duct humidity and
temperature transmitters, or control signal input
connections from a building control system, use
18-gauge (minimum) plenum-rated twisted-pair
wire, Belden #88760, with cable shielding and
drain wire for grounding.
Return all shielded cable connections to the
control cabinet for grounding. Do not ground
shield at the device end.
IMPORTANT: Locate the control cabinet
so that wire lengths are 50 feet or less to the
humidifier.
Use 18-gauge stranded wire run in conduit (see
Figure 13-1) for probe and low-water cut off
wiring.
IMPORTANT: Do not use shielded cable
for probe wiring.
OM-VL3-11
Vista de pagina 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 74 75

Comentarios a estos manuales

Sin comentarios